1) From the following, which software has been characterized by ‘Number Crunching’ Algorithms?
a. System software
b. Artificial intelligence software
c. Embedded software
d. Engineering and scientific software
ANSWER: Engineering and scientific software
2) IEEE provides a standard as IEEE 830-1993. For which activity this standard is recommended standard?
a. Software requirement specification.
b. Software design.
c. Testing.
d. Both a and b
ANSWER: Software requirement specification.
3) A generic process framework for software engineering encompasses five activities. What are those activities?
a. Communication, risk management, measurement, production, deployment.
b. Communication, Planning, Modeling, construction, deployment.
c. Analysis, designing, programming, debugging, maintenance
d. None of the above.
ANSWER: Communication, Planning, Modeling, construction, deployment.
4) Who deliver the technical skills that are necessary to engineer for a product or an application?
a. Project managers
b. Practitioners
c. Customers
d. End users
ANSWER: Practitioners
5) Project risk factor is considered in which model?
a. Spiral model.
b. Waterfall model.
c. Prototyping model
d. None of the above.
ANSWER: Spiral model.
6) What is a child window that contains message for the user and request for some action to be taken?
a. Dialogue box
b. Text-Box
c. Check-Box
d. Radio Button
ANSWER: Dialogue box
7) A Project can be characterized as _____ .
a. Every project may not have a unique and distinct goal.
b. Project is routine activity or day-to-day operations.
c. Project does not comes with a start time and end time.
d. All mentioned above.
e. None of the above.
ANSWER: None of the above.
8) Which model is not suitable for large software projects but good one for learning and experimenting?
a. Big Bang model
b. Spiral model
c. Iterative model
d. Waterfall model
ANSWER: Big Bang model
9) Which includes modifications and updations done in order to correct or fix the problems, that are either discovered by user or concluded by user error reports?
a. Perfective maintenance
b. Adaptive maintenance
c. Corrective maintenance
d. Preventive maintenance
ANSWER: Corrective maintenance
10) Boehm suggests an approach that addresses project objectives, milestones and schedules, responsibilities, management and technical approaches and required resources, This principle is called as ______ .
a. W3HH principle
b. WHO principle
c. W5HH principle
d. None of the above.
ANSWER: W5HH principle
11) The objective for formal technical review is to core errors in software work products.
a. True
b. False
ANSWER: False
12) CASE tools are set of automated software application programs, that are not used to support, accelerate and smoothen the SDLC activities.
a. Yes
b. No
ANSWER: No
13) From the following give three major categories of risk,
1) Schedule risk
2) Project risk
3) Technical risk
4) Business risk
a. 1,2 and 3
b. 2,3 and 4
c. 1,2 and 4
d. 1,3 and 4
ANSWER: 2,3 and 4
14) Activities and action taken on the data are represented by circle or round-edged rectangles is called _____ .
a. Entities
b. Process
c. Data storage
d. Data flow
ANSWER: Process
15) The six sigma for software engineering what gives the existing process and its output to determine the current quality performance?
a. Define
b. Analyze
c. Measure
d. None of the above
ANSWER: Measure
16) Which tools are helpful in all the stages of SDLC, for requirement gathering to testing and documentation?
a. Upper case tools
b. Lower case tools
c. Integrated case tools
d. None of the above
ANSWER: Integrated case tools
17) OOD languages provide a mechanism where methods performing similar tasks but vary in arguments, and that can be assigned to the same name is called _____ .
a. Classes
b. Object
c. Polymorphism
d. Encapsulation
ANSWER: Polymorphism
18) Abbreviate the term SMI.
a. Software Maturity Index
b. Software Model Instruction
c. Software Maturity Instruction
d. Software Model Index
ANSWER: Software Maturity Index
19) What computer-based system can have a profound effect on the design that is chosen and also the implementation approach will be applied?
a. Scenario-based elements
b. Class-based elements
c. Behavioural elements
d. Flow-oriented elements
ANSWER: Behavioural elements
20) SRS is a document created by system analyst after the requirements are collected from various stakeholders.
a. Yes
b. No
ANSWER: Yes
21) Which structures in Organizational Paradigms on a team loosely and depends on individual initiative of the team members?
a. Closed paradigm
b. Open paradigm
c. Random paradigm
d. Synchronous paradigm
ANSWER: Random paradigm
22) Give the name to diagram that represents the flow of activities described by the use cases and at the same time the captors are involved in UML .
a. State diagram
b. Swim lane diagram
c. Activity diagram
d. Component diagram
ANSWER: Swim lane diagram
23) Which phase is refers to the support phase of software development?
a. Acceptance Phase.
b. Testing.
c. Maintenance.
d. None of the above.
ANSWER: Maintenance.
24) Which model is also called as the classic life cycle or the Waterfall model?
a. Iterative Development
b. Linear Sequential Development
c. RAD Model.
d. Incremental Development
ANSWER: Linear Sequential Development
25) What is the average effective global activity rate in an evolving E-type system is invariant over the lifetime of the product?
a. Self-regulation
b. Reducing quality
c. Feedback systems
d. Organizational stability
ANSWER: Organizational stability